Qingsheng Knitting logoSock Wholesalers Styles Quote Request a quote
Printable sheet · Inspection

Nine checks on one sheet, in the order they happen

This is the inspection we run on a bulk sock order, printed so two people can walk the same line with the same list. It carries nine checks in the order they happen on this floor, the reference each one is measured against, and the point in the run where it is taken. Print it, tick the boxes, and keep the sheet with the carton.

9 checks

From yarn lot to carton mark.

1 page

The nine-check table and its tick column, on one page.

20–30 days

Bulk run after the deposit and an approved sample.

144–400 pairs

Per carton, set per style, so the count closes.

Packed sock cartons stacked in the warehouse area before loading
The last check on the sheet is taken here, at the carton, before it is sealed.

Print this sheet: press Ctrl+P, or Cmd+P on a Mac, and choose portrait at 100%.

How to print this sheet

Print this page: Ctrl+P on Windows, Cmd+P on a Mac. On the paper you get the nine-check table and its two writing columns, on one page.

  • Paper: A4, portrait.
  • Scale: 100%, fit to page off, so the tick and reading columns stay wide enough to write in.
  • Headers and footers: off in the print dialog, so the browser's date and address line stay off the sheet.
  • Pen: tick the OK box, then write the centimeter or the pair count in the Reading column.

The table prints whole on that one page; the sections above and below it stay on screen.

Basis: the QC checklist, which writes the same nine checks out as reading.

The nine checks, with a box for each

Each line names what is checked, the reference it is measured against, and where in the run it happens. A check with no reference is an opinion.

Order number ____________   Style ____________   Date ____________

CheckReferenceWhenReadingOK
Yarn lot and shadeApproved specification: the lot set asideBefore the first course ☐
Stitch densitySigned sampleFirst off the machine ☐
Foot lengthApproved specification: the centimeter bandFirst off the machine, then mid run ☐
Cuff tensionSigned sampleFirst off the machine, then mid run ☐
Toe linkingSigned sample: no ridge, no loose endFirst off the machine, then mid run ☐
Heel positionSigned sampleFirst off the machine ☐
Grip dot adhesionSigned sample, with the approved placementFirst off the machine ☐
Color against standardApproved specification: the color standardMid run ☐
Pair count and size splitPackaging proof: packing list and carton markBefore the carton is sealed ☐

The three references are not interchangeable. A signed sample answers a question about hand and fit, an approved specification one about numbers, a packaging proof one about what is printed and counted.

Basis: the QC checklist, which sets the signed sample as the pass mark.

Who can stand at the check

Three routes, and any of them can work on one order.

On a video call

The desk walks the line with the sheet in hand, camera on the machine, the linking station and the carton, and you see the check taken and the number written. Book a call through the contact page, on the day the cartons are packed and still open.

A commissioned inspector, or your own

SGS, BV or TUV, booked and paid for by you, or your own inspector on your own account. You book and you pay, and the desk holds the cartons for the visit. On the floor the inspector gets the line, the packed cartons and the inline records, plus the signed sample in each size and the approved specification. Anything beyond that, the inline records included, is agreed with the booking.

Basis: the sample page, where the signed copy an inspector measures against is approved.

When a finding lands

A finding stops the check that produced it. The affected pairs come out of the flow rather than into the carton.

  1. Rework. The pairs go back to the operation that missed: a re-link, a re-board, a re-pack. Count, check line and reason are written on this sheet.
  2. Re-inspection. The same check is taken again against the same reference, on the reworked pairs and on the pairs either side of them.
  3. Re-book. Where the re-inspection lands after the cut-off for the booked visit, the sailing is re-booked, and the effect on the shipment date is confirmed when the finding is raised.

Deviation, rework and re-inspection go into the record for the order, which goes out in writing. Where your own standard is stricter, write it on the specification sheet and the check runs against yours.

Basis: the pre-shipment inspection FAQ, which answers who books the check and who holds the carton.

What to send with your booking

Five things and the check runs without a second email.

  • The order number and the style.
  • The date the sample was signed, so a later sample is not used as the mark.
  • The packaging proof you approved, where labels and carton mark are printed.
  • The week you want the check taken, and whether it is a call or an inspector.
  • The size split per carton, so the last line closes on a figure.

Send it with the booking and the desk answers within one working day, Monday to Friday. The quote process page carries the same sequence, and the adult size sheet holds the band the foot-length line reads.

Basis: the QC checklist, which carries the request line for a live order.

Where these figures come from

  1. Our own QC checklist — the nine checks and the signed sample as pass mark.
  2. Our own pre-shipment inspection FAQ — who runs the check and who books it.
  3. Our own sample page — the signed copy every check measures against.
  4. Our own adult size chart sheet — the band the foot-length line reads.

Book a check on your run

Send the order number and the week you want the check taken. The desk answers within one working day and holds the carton.

Bulk production runs 20–30 days after the deposit and an approved sample.

Page last updated: November 13, 2026