Qingsheng Knitting logoSock Wholesalers Styles Quote Request a quote
After-sales

Returns and after-sales

What happens when a bulk run does not match the sample you approved: what we take back, the window you have, who carries the freight, how to raise it, and what we write down. All of it on one page, so nobody has to guess.

1. What we take back

Bulk runs to the sample you approved, and a signed copy stays on file against your order number — that sample is the binding reference. Your checkpoints are the inline checks during production and the pre-shipment check before the cartons close; attend by video or send your own inspector.

So the case this page is written for is a bulk run that does not match that approved sample. That is the situation we accept and put right. Custom production is made to the sample you sign off, so a signed-off sample is not returnable for reasons other than a quality fault.

The quality baseline is the sample you signed off together with the specification on your proforma invoice — where a value is set per order, the PI for that order is where it is stated.

The wholesale frame around an order — minimums, freight, lead times — is collected on the wholesale terms page.

2. The window, and who carries the cost

  1. 01Raise it within 30 days. Tell us in writing within 30 days of the goods arriving, with your order number, so the batch is still identifiable at your end.
  2. 02Show us what you are seeing. Photographs or a video of the goods, or a report from the third-party inspector you commissioned — the inspector you commission reports to you, not to us.
  3. 03We put it right first. A repair or a remake comes first; where a remake is not the practical route, a credit against your next run is the alternative we use.
  4. 04Freight and duties follow the fault. Where the fault is ours, we carry the cost of putting it right, including return freight on a repair or remake. Where the reason is not a quality fault, the return freight sits with the buyer. Duties and taxes follow the same split as the freight.

Sampling is charged per style; the sampling fee is credited against your first bulk order; we quote the fee with your quotation, and you cover the courier freight. Sample-fee currency, payment rail and any fees follow the proforma invoice.

The binding lead time is the one stated on your proforma invoice.

3. How to raise it, and when you hear back

If anything does not match, write to the export desk with your order number. The same export desk runs the case from first brief to the cartons closing: sales@sockwholesalers.com, answered within one working day. Put your PI number in the subject line and the desk reads it as a claim on an existing order rather than a new brief.

A first reply reaches you within one working day. Where the case needs an inspection, a remake or a costing, the decision on what we do about it follows within 10 working days of the evidence arriving.

Take the case this page is written for: the first carton from a 1,000-pair run arrives and the toe seam has opened on some of the pairs. Nothing below is a new term — it is the four steps above, filled in with the figures already on this page.

Step 1. Write to the export desk inside the 30-day window, with the order number and the style, so the batch can still be identified at your end. Step 2. Attach photographs of the open seams and of the carton label, or the report from the inspector you commissioned. Step 3. The first reply is inside one working day; the decision on what we do follows within 10 working days of the evidence arriving. Step 4. The case is written onto the record against your order number with the four entries below, and it stays there until a closing date is entered.

How far it goes is decided by the evidence and by where responsibility is judged to sit: a repair or a remake first, and a credit against your next run where a remake is not the practical route. The judgement of responsibility is the third entry on the record, and it is written down rather than left in a call.

The photographs and inspection records behind a claim come from the same place as the rest of your paperwork — the current inspection report and document set is kept on the customer document desk.

4. What we record

  • What the issue is
  • Where responsibility was judged to sit
  • What we did about it
  • The date the case closed

A case stays open on that record until the closing date is written into it.

Every case is recorded against your order number, so the reply, the claim and the paperwork all refer to one case., so the outcome you were told and the paperwork that followed refer to the same case rather than to two versions of it.

The terms of use and of enquiry are the terms we work to. A sale is governed by the contract and the proforma invoice issued for it. What governs a sale remains what the proforma invoice and the contract behind it state.

5. Shortage, wrong item and transit damage

A run can arrive short, carry the wrong style, or reach you damaged. Each of the three is counted a different way, and all three are settled from the packing list rather than from memory.

Count each carton against the packing list as it lands, and file any shortfall, wrong-item or transit-damage claim inside the 30-day window that starts on delivery. Write the missing pairs on that packing list as you open each carton — that annotated copy is the document the claim is built on.

Short shipment. Pairs that were invoiced and did not arrive are either made up in the next run or credited at that style’s unit price, whichever suits you better. Which one it is comes back in the reply.

Wrong item. A style, size, color or mark that does not match the approved sample and the packing list goes back at our cost — the return freight and the clearance on it are ours — and the correct goods come forward.

Transit damage. Damage done on the way is claimed against the carrier, so it has to be visible on paper at the door: write the damage on the carrier’s delivery note before you sign it, photograph the carton and the goods inside, and send both. We open the case and come back with what we do about it within 48 hours.

The 30-day window in section 2 covers a run that does not match your approved sample. Shortage, a wrong item and transit damage are counted inside the seven-day window above, because the carrier’s own claim period and our loading record are both settled inside it.

6. Start the claim here

If you would rather not open your mail client, the same request goes through this form: it reaches the same export desk, and it is answered inside the same one working day.

Put the order number, how many pairs are affected and what the fault is into the message box. Photographs and inspection reports follow in the reply — a claim file is only as good as the evidence attached to it, and this form cannot carry files.

Use the address the order was placed from, so the claim lands on the same record.
Three lines is enough: the order, the count, the fault. Photographs go in the reply — this form cannot carry files.
WhatsApp +86-13761030160

Write to the export desk with your order number

Put your PI number in the subject line and the desk reads it as a claim on an existing order rather than a new brief. A first reply reaches you within one working day.

sales@sockwholesalers.com, +86-13761030160. We answer every enquiry within one working day; replies come from Michelle Zhang, Export sales manager.

Page last updated: November 12, 2026