Three clocks stack on one order, and only one is ours
A buyer holds two dates: the day the deposit leaves, and the day the stock has to be on a shelf. Between them sit three lead times, and they run in sequence.
- Bulk. 20–30 days from the day the deposit is received and the sample approved. Each further sample round adds 3–5 days in front of it.
- Sea. 25–40 days from load port to discharge port. The next section is about the width of that range.
- Arrival. Discharge, clearance and the inland leg. The container has landed; the stock is still at the port.
Put the two windows end to end and the arithmetic is plain. 20 plus 25 is 45 days from a cleared deposit to a landed container, and 30 plus 40 is 70. Arrival handling adds its own days.
Source: the stage-by-stage windows on our lead-time page, which quotes bulk at 20–30 days and sea at 25–40, each from its own start point.
Why the sea window is a range, and what sits inside it
A 25–40 day figure is not a hedge. It is the spread between the quickest routing the desk will commit to and the slowest one on your lane.
- Sailing frequency out of the load port: a weekly service and a fortnightly one give different worst cases.
- Whether the box runs direct or transships, which decides how many handovers it can wait at.
- The queue at the discharge port in the week the vessel arrives.
Only the sailing is settled when the desk books. The rest belong to the carrier and to the port, which is why the window has two ends instead of one date. What is ours is shorter: cartons closed on the date we name, and the box at the terminal before cut-off.
Source: the transit table on our shipping page, which quotes sea at 25–40 days by destination.
Back-scheduling a landing date
Take the day the stock has to be in the warehouse, subtract arrival handling, the sea window and the bulk window, and what is left is the day the deposit has to clear. The table reads both ends off a sailing date.
| Container sails | Lands at 25 days | Lands at 40 days | Deposit clears by |
|---|---|---|---|
| January 15 | February 9 | February 24 | December 16 |
| February 15 | March 12 | March 27 | January 16 |
| March 15 | April 9 | April 24 | February 13 |
| April 15 | May 10 | May 25 | March 16 |
| May 15 | June 9 | June 24 | April 15 |
Dates are month and day. The last column is the sailing date minus 30 days.
One date, worked through
Stock has to be in the warehouse on March 5. Five days at arrival puts the container at the discharge port by February 28. At 40 days the last sailing that holds that date is January 19, landing between February 13 and February 28.
Bulk runs 20–30 days, so the deposit has to clear between December 20 and December 30. Ten days wide, closing about ten weeks before the stock is wanted.
Source: our deposit-to-cartons calendar, which breaks the same 20–30 day window into the five stops on our floor.
A fixed date, a month, and the booking each one buys
Two briefs arrive in the same words. One has a seasonal floor date a competitor will be on before you are; the other has a window and a warehouse.
A fixed date needs the back-schedule, a slot held before the cartons close, and one person on the buyer's side who can approve a sample inside the bulk window.
A month can be planned forward. The deposit clears, production runs, and the desk books the first sailing after the cartons close. Nothing there is tight, and the freight is usually the better buy on a measured load.
The booking follows the same split. Held against a planned volume, the desk buys days and reconciles when the cartons close. Booked on closed cartons, the lading is exact and the sailing waits for a count.
Source: the carton figures on our shipping volume page, which starts every calculation from the sealed 100-pair carton.
What an air upgrade buys on a late order
Air moves the same cartons in 5–10 days. Against 25–40 at sea that recovers between 15 and 35 days, which is the whole bulk window at the wide end.
The cost side is chargeable weight. Air is priced against the weight and the space a carton takes, and a sock carton is light for the room it fills: 0.00048 m³ a pair at the example’s 200 pairs is 0.096 m³, so space drives that number more than kilos do.
That is why the upgrade usually goes on part of an order. Send the assortment that opens the season by air, keep the reorders on the water, and the date is met on the stock that has to be on the shelf on the day. Ask for the split at the quotation stage.
Source: our shipping page, which quotes air at 5–10 days and express at 3–7 against 25–40 at sea.
What one email has to pin down before the deposit leaves
Six lines. They are the only part of the plan that can be argued with later.
| The line | What it fixes |
|---|---|
| The deposit date, noting that the bulk clock starts when the money is received. | The day the 20–30 day window opens. |
| The sample approval date, and the sample rounds the price covers. | The other condition on that window. |
| The sail week, and whether the slot is held on planned volume or closed cartons. | What the booking is made against. |
| The landing window, written as both ends of the sea window and not one date. | The date your shelf plan is built on. |
| The date the balance is due, which is against a copy of the bill of lading. | The day the last 70% leaves. |
| The Incoterm, because EXW, FOB, CIF, DAP and DDP hand the arrival leg to different parties. | Who runs the leg after the box lands. |
Send the six lines with the brief. The desk answers within one working day, Monday to Friday, 09:00–18:00 China Standard Time.
Source: our Incoterms page, which names the four codes we quote and the edition they are written in.
- Our own shipping page — sea at 25–40 days, air at 5–10, express at 3–7.
- Our own lead-time page — bulk at 20–30 days, after the deposit and the approved sample.
- Our own shipping volume page — 144–400 pairs a carton, 0.00048 m³ a pair at the example carton.
- The arithmetic here — 20 plus 25 is 45, 30 plus 40 is 70.